Multiple Choice Multiple Answer
Question
TQM can never flourish if the staff are:-
Correct Answer
Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Your Answer
Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality
Multiple Choice Single Answer
Question
The concept of quality circle was mooted by :-
Correct Answer
Prof. Kaoishikawa
Your Answer
Prof. Kaoishikawa
Match The Following
Question
Correct Answer
Your Answer
SMED
Setup time reduction
Setup time reduction
5 'S
Cleanliness
Total productive maintenance
Muda elimination
Waste elimination
Waste elimination
Poka-Yoke
Error proofing
Error proofing
Multiple Choice Single Answer
Question
Allowing worker's to stop machine / assembly line if they believe that product quality is below standard' is an example of :-
Correct Answer
Empowerment
Your Answer
Involvement
Select The Blank
Question
Kaizen is ________ supported process.
Correct Answer
Management
Your Answer
Workmen
Select The Blank
Question
Ratio of ________ to the number of pieces inspected is called fraction defectives.
Correct Answer
Number of item rejected
Your Answer
Number of item rejected
Multiple Choice Single Answer
Question
Histogram always indicates :-
Correct Answer
Only height
Your Answer
Percentage defect
Multiple Choice Single Answer
Question
List of customers, to carry out parato analysis to identify customers who gives business includes :-
Correct Answer
Present & past customers
Your Answer
Present & past customers
Multiple Choice Single Answer
Question
Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer
Gap in performance
Multiple Choice Multiple Answer
Question
Steps to six sigma process consists of :-
Correct Answer
Identify the work you do , Identify your customers , Map the process
Your Answer
Identify the work you do , Identify your customers , Map the process
Multiple Choice Single Answer
Question
From scatter diagram the strength of relationship between two variables or associated set of data can be inferred from the examination of the shape of :-
Correct Answer
Cloud
Your Answer
Cloud
True/False
Question
Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ used to detect drop in air pressure.
Correct Answer
Buzzers / alarms
Your Answer
Locators
Multiple Choice Single Answer
Question
TQM is a way to improve quality of product and service :-
Correct Answer
Continuously
Your Answer
Continuously
Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Match The Following
Question
Correct Answer
Your Answer
In scatter diagram, the strength of relationship can be determined
By "correlation coefficient"
By "correlation coefficient"
The scatter diagram provides the technique to establish
The possible relationship between a pair of variables
The possible relationship between a pair of variables
The scatter diagram displays
The pair of data as a cloud of points
The pair of data as a cloud of points
The scatter is also known as
Correlation diagram
Correlation diagram
True/False
Question
Flow chart is pictorial representation of the steps in production control.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Pareto's analysis underlines & operates philosophy of :-
Correct Answer
Vital few = trivial many
Your Answer
Vital few = trivial many
Multiple Choice Single Answer
Question
Pareto diagram always indicate magnitude of :-
Correct Answer
Defect
Your Answer
Influence of defect
True/False
Question
By cutting the cost of quality, profitability decreases.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :-
Correct Answer
Simplest tool
Your Answer
Simplest tool
True/False
Question
The flow charts are prepared to enhance the employees understanding of the process by indicating interrelationship within the process.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Abnormal variations can occur if :-
Correct Answer
There are assignable causes
Your Answer
There are assignable causes
Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :-
Correct Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke , Standards type Poka-Yoke
True/False
Question
Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Kaizen is an excellent method to involve ________ to unearth & eliminate hidden waste.
Correct Answer
Employees
Your Answer
Employers
Multiple Choice Multiple Answer
Question
To reduce Muda of transport, techniques used are :-
Correct Answer
Cellular layout , Method study , 5 'S
Your Answer
Cellular layout , Method study , 5 'S
Select The Blank
Question
Cp for six sigma process is ________
Correct Answer
2
Your Answer
2
Select The Blank
Question
________ participants in monthly meeting(MRM)
Correct Answer
GM, operation heads, corporate functional heads
Your Answer
Department heads & supervisors
True/False
Question
Processing cost of a product is mainly decided by conversion process.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Production in last shift & production plan for next shift is discussed during ________.
Correct Answer
Shift beginning & shift end/change meeting
Your Answer
Shift beginning & shift end/change meeting
Multiple Choice Multiple Answer
Question
Material Supply on DSL basis helps :-
Correct Answer
To eliminate handling , To reduce transporting , To reduce inspection
Your Answer
To eliminate handling , To reduce transporting , To reduce inspection
True/False
Question
Inadequate maintenance of machine leads to muda of defects
Correct Answer
True
Your Answer
True
True/False
Question
Most of the external setups are treated as internal setup.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Benefits from SMED are :-
Correct Answer
Reduce work in process , Better average daily production , Increase capacity
Your Answer
Reduce work in process , Better average daily production , Increase capacity
Multiple Choice Multiple Answer
Question
Typical examples of process benchmark are :-
Correct Answer
Procurement procedures , Budgeting , Recruitment
Your Answer
Procurement procedures , Budgeting , Recruitment
True/False
Question
Low level of delegation is an example of muda in office.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Histograms are useful to :-
Correct Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Multiple Choice Multiple Answer
Question
While preparing scatter diagram following precautions are to be taken :-
Correct Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Multiple Choice Single Answer
Question
Through continuous improvement in the process & procedures, kobetsu-kaizen is continuously improve utilization of :-
Correct Answer
Worker, equipment & material
Your Answer
Workers & materials
True/False
Question
Every department should make their own rules of standardization.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Quality circle should consist adequate experienced members between :-
Correct Answer
8 to 10
Your Answer
8 to 10
Multiple Choice Single Answer
Question
Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer
As many as management decides
Select The Blank
Question
Flow chart helps to provide clarity of the ________ without visiting actual spot.
Correct Answer
Process
Your Answer
Process
Multiple Choice Single Answer
Question
Gap in performance = Ideal situation minus :-
Correct Answer
Current situation
Your Answer
Current situation
Select The Blank
Question
Seminar talks and video show are organized to introduce TPM concept to ________
Correct Answer
General employees
Your Answer
General employees
True/False
Question
Process capability index Cp is a measure of capability of the process to meet the specification limits.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Basic objective of control chart is to ________ the variation due to chance & assignable cause.
Correct Answer
Separate out
Your Answer
Eliminate
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality
Multiple Choice Single Answer
Question
Kaizen process is built on PDCA cycle, where P represents :-
Correct Answer
PLAN
Your Answer
PLAN
Multiple Choice Single Answer
Question
One Green Belt may head a team of :-
Correct Answer
20 employees
Your Answer
20 employees
Select The Blank
Question
Flow chart helps to dissect a process for better understanding & ________ of process.
Correct Answer
Analysis
Your Answer
Analysis
Select The Blank
Question
________ analysis is a central tenet of Kaizen.
Correct Answer
Root cause
Your Answer
Root cause
True/False
Question
Defects are not the consequences of human errors.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Benefits of Daily work management are :-
Correct Answer
Improve resource utilization through gap analysis , Faster response to customer needs , Better communication
Your Answer
Improve resource utilization through gap analysis , Faster response to customer needs , Better communication
Select The Blank
Question
Due to SMED, ________ time cuts down.
Correct Answer
Waiting
Your Answer
Waiting
Multiple Choice Multiple Answer
Question
Limitation of quality circles are :-
Correct Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union
Your Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union
Multiple Choice Single Answer
Question
In traditional manufacturing line :-
Correct Answer
Cycle time is more
Your Answer
Cycle time is more
Select The Blank
Question
Each quality characteristic has permitted variation & is equal to ________.
Correct Answer
USL - LSL
Your Answer
USL - LSL
Multiple Choice Single Answer
Question
Assignable causes :-
Correct Answer
Can be eliminated
Your Answer
Can be eliminated
Multiple Choice Multiple Answer
Question
After finding out the solution & working on it, the equally important job is :-
Correct Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for your next project
True/False
Question
Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer
False
Your Answer
False
True/False
Question
Most of the external setups are treated as internal setup.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Few main steps to construct a Histogram after deciding classes, class width & class boundaries are :-
Correct Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Your Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Multiple Choice Single Answer
Question
Pricing in JIT purchasing is done by
Correct Answer
Buyer and seller together
Your Answer
Buyer and seller together
Multiple Choice Single Answer
Question
The first step in setup time operation studies is to time each setup, took, review task & :-
Correct Answer
Separate internal & external setup task
Your Answer
Separate internal & external setup task
Select The Blank
Question
Poka Yoke is ________.
Correct Answer
Simple technique
Your Answer
Simple technique
Select The Blank
Question
To find out root cause ________used
Correct Answer
Why-why Technique
Your Answer
Why-why Technique
Multiple Choice Multiple Answer
Question
Steps to six sigma process consists of :-
Correct Answer
Identify the work you do , Identify your customers , Map the process
Your Answer
Identify the work you do , Identify your customers , Map the process
True/False
Question
Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ % of quality problems are due to individual errors.
Correct Answer
15
Your Answer
15Question
Ishikawa diagram is also known as :-
Correct Answer
Cause & effect diagram
Your Answer
Cause & effect diagram
True/False
Question
Implementation of all 8 TPM pillar activities must start at a time .
Correct Answer
False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Review your efforts & success achieved
Check
Check
Act about the causes found out
Do
Do
Collect the initial data for the problem
Plan
Plan
Actions further after reviewing the progress
Act
Act
Select The Blank
Question
Technique involved in listing of setup task, establishing technological relationship between tasks, drawing arrow diagram is called as ________.
Correct Answer
Network diagram
Your Answer
Network diagram
True/False
Question
U-Line layout is better than straight lime layout.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position.
Correct Answer
Color coding
Your Answer
Color coding
Multiple Choice Multiple Answer
Question
Benefits from the standardized containers are
Correct Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Your Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Multiple Choice Single Answer
Question
Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer
Two to three per year
True/False
Question
Graph is a tabulated representation of the data which is easily understandable at a glance.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Time required to study blue prints / drawing is included in :-
Correct Answer
Setup time
Your Answer
Setup time
Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is higher than specification tolerance are
Correct Answer
100 % inspection is required , Reduce variability , Possibility of squeezing tolerances
Your Answer
100 % inspection is required , Reduce variability
Multiple Choice Single Answer
Question
Withdrawal kanban is presented by :-
Correct Answer
C- kanban
Your Answer
C- kanban
Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative of homogeneous segment of production for which :-
Correct Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Your Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Select The Blank
Question
To eliminate muda of processing, ________ exercise is essential.
Correct Answer
ECRS
Your Answer
MOST
Multiple Choice Multiple Answer
Question
Cleaning your own area/equipments gives benefits of :-
Correct Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust
Your Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust
True/False
Question
Performance benchmarking does not involves comparison of financial ratios at the aggregate level.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Material Supply on DSL basis helps :-
Correct Answer
To eliminate handling , To reduce transporting , To reduce inspection
Your Answer
To eliminate handling , To reduce transporting , To reduce inspection
Multiple Choice Single Answer
Question
Chance causes :-
Correct Answer
Cannot be identified
Your Answer
Cannot be identified
Multiple Choice Multiple Answer
Question
The alternate meaning of seiso is
Correct Answer
Sanities , Cleanup , Dust free / scrab
Your Answer
Sanities , Cleanup , Dust free / scrab
Multiple Choice Single Answer
Question
Production kanban is presented by :-
Correct Answer
P-kanban
Your Answer
P-kanban
Question
TQM can never flourish if the staff are:-
Correct Answer
Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Your Answer
Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality
Multiple Choice Single Answer
Question
The concept of quality circle was mooted by :-
Correct Answer
Prof. Kaoishikawa
Your Answer
Prof. Kaoishikawa
Match The Following
Question
Correct Answer
Your Answer
SMED
Setup time reduction
Setup time reduction
5 'S
Cleanliness
Total productive maintenance
Muda elimination
Waste elimination
Waste elimination
Poka-Yoke
Error proofing
Error proofing
Multiple Choice Single Answer
Question
Allowing worker's to stop machine / assembly line if they believe that product quality is below standard' is an example of :-
Correct Answer
Empowerment
Your Answer
Involvement
Select The Blank
Question
Kaizen is ________ supported process.
Correct Answer
Management
Your Answer
Workmen
Select The Blank
Question
Ratio of ________ to the number of pieces inspected is called fraction defectives.
Correct Answer
Number of item rejected
Your Answer
Number of item rejected
Multiple Choice Single Answer
Question
Histogram always indicates :-
Correct Answer
Only height
Your Answer
Percentage defect
Multiple Choice Single Answer
Question
List of customers, to carry out parato analysis to identify customers who gives business includes :-
Correct Answer
Present & past customers
Your Answer
Present & past customers
Multiple Choice Single Answer
Question
Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer
Gap in performance
Multiple Choice Multiple Answer
Question
Steps to six sigma process consists of :-
Correct Answer
Identify the work you do , Identify your customers , Map the process
Your Answer
Identify the work you do , Identify your customers , Map the process
Multiple Choice Single Answer
Question
From scatter diagram the strength of relationship between two variables or associated set of data can be inferred from the examination of the shape of :-
Correct Answer
Cloud
Your Answer
Cloud
True/False
Question
Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ used to detect drop in air pressure.
Correct Answer
Buzzers / alarms
Your Answer
Locators
Multiple Choice Single Answer
Question
TQM is a way to improve quality of product and service :-
Correct Answer
Continuously
Your Answer
Continuously
Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Match The Following
Question
Correct Answer
Your Answer
In scatter diagram, the strength of relationship can be determined
By "correlation coefficient"
By "correlation coefficient"
The scatter diagram provides the technique to establish
The possible relationship between a pair of variables
The possible relationship between a pair of variables
The scatter diagram displays
The pair of data as a cloud of points
The pair of data as a cloud of points
The scatter is also known as
Correlation diagram
Correlation diagram
True/False
Question
Flow chart is pictorial representation of the steps in production control.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Pareto's analysis underlines & operates philosophy of :-
Correct Answer
Vital few = trivial many
Your Answer
Vital few = trivial many
Multiple Choice Single Answer
Question
Pareto diagram always indicate magnitude of :-
Correct Answer
Defect
Your Answer
Influence of defect
True/False
Question
By cutting the cost of quality, profitability decreases.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :-
Correct Answer
Simplest tool
Your Answer
Simplest tool
True/False
Question
The flow charts are prepared to enhance the employees understanding of the process by indicating interrelationship within the process.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Abnormal variations can occur if :-
Correct Answer
There are assignable causes
Your Answer
There are assignable causes
Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :-
Correct Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke , Standards type Poka-Yoke
True/False
Question
Control limits of control charts should be revised from time to time as additional data is accumulated.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Kaizen is an excellent method to involve ________ to unearth & eliminate hidden waste.
Correct Answer
Employees
Your Answer
Employers
Multiple Choice Multiple Answer
Question
To reduce Muda of transport, techniques used are :-
Correct Answer
Cellular layout , Method study , 5 'S
Your Answer
Cellular layout , Method study , 5 'S
Select The Blank
Question
Cp for six sigma process is ________
Correct Answer
2
Your Answer
2
Select The Blank
Question
________ participants in monthly meeting(MRM)
Correct Answer
GM, operation heads, corporate functional heads
Your Answer
Department heads & supervisors
True/False
Question
Processing cost of a product is mainly decided by conversion process.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Production in last shift & production plan for next shift is discussed during ________.
Correct Answer
Shift beginning & shift end/change meeting
Your Answer
Shift beginning & shift end/change meeting
Multiple Choice Multiple Answer
Question
Material Supply on DSL basis helps :-
Correct Answer
To eliminate handling , To reduce transporting , To reduce inspection
Your Answer
To eliminate handling , To reduce transporting , To reduce inspection
True/False
Question
Inadequate maintenance of machine leads to muda of defects
Correct Answer
True
Your Answer
True
True/False
Question
Most of the external setups are treated as internal setup.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Benefits from SMED are :-
Correct Answer
Reduce work in process , Better average daily production , Increase capacity
Your Answer
Reduce work in process , Better average daily production , Increase capacity
Multiple Choice Multiple Answer
Question
Typical examples of process benchmark are :-
Correct Answer
Procurement procedures , Budgeting , Recruitment
Your Answer
Procurement procedures , Budgeting , Recruitment
True/False
Question
Low level of delegation is an example of muda in office.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Histograms are useful to :-
Correct Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Multiple Choice Multiple Answer
Question
While preparing scatter diagram following precautions are to be taken :-
Correct Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Multiple Choice Single Answer
Question
Through continuous improvement in the process & procedures, kobetsu-kaizen is continuously improve utilization of :-
Correct Answer
Worker, equipment & material
Your Answer
Workers & materials
True/False
Question
Every department should make their own rules of standardization.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Quality circle should consist adequate experienced members between :-
Correct Answer
8 to 10
Your Answer
8 to 10
Multiple Choice Single Answer
Question
Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer
As many as management decides
Select The Blank
Question
Flow chart helps to provide clarity of the ________ without visiting actual spot.
Correct Answer
Process
Your Answer
Process
Multiple Choice Single Answer
Question
Gap in performance = Ideal situation minus :-
Correct Answer
Current situation
Your Answer
Current situation
Select The Blank
Question
Seminar talks and video show are organized to introduce TPM concept to ________
Correct Answer
General employees
Your Answer
General employees
True/False
Question
Process capability index Cp is a measure of capability of the process to meet the specification limits.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Basic objective of control chart is to ________ the variation due to chance & assignable cause.
Correct Answer
Separate out
Your Answer
Eliminate
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer
Improve quality
Multiple Choice Single Answer
Question
Kaizen process is built on PDCA cycle, where P represents :-
Correct Answer
PLAN
Your Answer
PLAN
Multiple Choice Single Answer
Question
One Green Belt may head a team of :-
Correct Answer
20 employees
Your Answer
20 employees
Select The Blank
Question
Flow chart helps to dissect a process for better understanding & ________ of process.
Correct Answer
Analysis
Your Answer
Analysis
Select The Blank
Question
________ analysis is a central tenet of Kaizen.
Correct Answer
Root cause
Your Answer
Root cause
True/False
Question
Defects are not the consequences of human errors.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Benefits of Daily work management are :-
Correct Answer
Improve resource utilization through gap analysis , Faster response to customer needs , Better communication
Your Answer
Improve resource utilization through gap analysis , Faster response to customer needs , Better communication
Select The Blank
Question
Due to SMED, ________ time cuts down.
Correct Answer
Waiting
Your Answer
Waiting
Multiple Choice Multiple Answer
Question
Limitation of quality circles are :-
Correct Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union
Your Answer
Problems headed by worker group must be simple & within their limit , Unions in India are reluctant , Management is also not open for union
Multiple Choice Single Answer
Question
In traditional manufacturing line :-
Correct Answer
Cycle time is more
Your Answer
Cycle time is more
Select The Blank
Question
Each quality characteristic has permitted variation & is equal to ________.
Correct Answer
USL - LSL
Your Answer
USL - LSL
Multiple Choice Single Answer
Question
Assignable causes :-
Correct Answer
Can be eliminated
Your Answer
Can be eliminated
Multiple Choice Multiple Answer
Question
After finding out the solution & working on it, the equally important job is :-
Correct Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for financial help for running the project
Your Answer
Prepare for the presentation of your work , Explain the progress by presentation to steering committee , Convince committee for your next project
True/False
Question
Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer
False
Your Answer
False
True/False
Question
Most of the external setups are treated as internal setup.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Few main steps to construct a Histogram after deciding classes, class width & class boundaries are :-
Correct Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Your Answer
Compute mid-point of the class (cell) & fill up the tally sheet determining the cell or class into which each value falls , Count the tally marks i.e. frequency in each class & construct a histogram by plotting a bar graph for each class , Analyze & conclude whether process is is meeting the requirement or not & take connective actions if needed.
Multiple Choice Single Answer
Question
Pricing in JIT purchasing is done by
Correct Answer
Buyer and seller together
Your Answer
Buyer and seller together
Multiple Choice Single Answer
Question
The first step in setup time operation studies is to time each setup, took, review task & :-
Correct Answer
Separate internal & external setup task
Your Answer
Separate internal & external setup task
Select The Blank
Question
Poka Yoke is ________.
Correct Answer
Simple technique
Your Answer
Simple technique
Select The Blank
Question
To find out root cause ________used
Correct Answer
Why-why Technique
Your Answer
Why-why Technique
Multiple Choice Multiple Answer
Question
Steps to six sigma process consists of :-
Correct Answer
Identify the work you do , Identify your customers , Map the process
Your Answer
Identify the work you do , Identify your customers , Map the process
True/False
Question
Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc.
Correct Answer
True
Your Answer
True
Select The Blank
Question
________ % of quality problems are due to individual errors.
Correct Answer
15
Your Answer
15Question
Ishikawa diagram is also known as :-
Correct Answer
Cause & effect diagram
Your Answer
Cause & effect diagram
True/False
Question
Implementation of all 8 TPM pillar activities must start at a time .
Correct Answer
False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Review your efforts & success achieved
Check
Check
Act about the causes found out
Do
Do
Collect the initial data for the problem
Plan
Plan
Actions further after reviewing the progress
Act
Act
Select The Blank
Question
Technique involved in listing of setup task, establishing technological relationship between tasks, drawing arrow diagram is called as ________.
Correct Answer
Network diagram
Your Answer
Network diagram
True/False
Question
U-Line layout is better than straight lime layout.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position.
Correct Answer
Color coding
Your Answer
Color coding
Multiple Choice Multiple Answer
Question
Benefits from the standardized containers are
Correct Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Your Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Multiple Choice Single Answer
Question
Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer
Two to three per year
True/False
Question
Graph is a tabulated representation of the data which is easily understandable at a glance.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Time required to study blue prints / drawing is included in :-
Correct Answer
Setup time
Your Answer
Setup time
Multiple Choice Multiple Answer
Question
Actions that can be thought for the process having process capability is higher than specification tolerance are
Correct Answer
100 % inspection is required , Reduce variability , Possibility of squeezing tolerances
Your Answer
100 % inspection is required , Reduce variability
Multiple Choice Single Answer
Question
Withdrawal kanban is presented by :-
Correct Answer
C- kanban
Your Answer
C- kanban
Multiple Choice Multiple Answer
Question
The aim of education & training under TPM is :-
Correct Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer
To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative of homogeneous segment of production for which :-
Correct Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Your Answer
The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch
Select The Blank
Question
To eliminate muda of processing, ________ exercise is essential.
Correct Answer
ECRS
Your Answer
MOST
Multiple Choice Multiple Answer
Question
Cleaning your own area/equipments gives benefits of :-
Correct Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust
Your Answer
You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust
True/False
Question
Performance benchmarking does not involves comparison of financial ratios at the aggregate level.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Material Supply on DSL basis helps :-
Correct Answer
To eliminate handling , To reduce transporting , To reduce inspection
Your Answer
To eliminate handling , To reduce transporting , To reduce inspection
Multiple Choice Single Answer
Question
Chance causes :-
Correct Answer
Cannot be identified
Your Answer
Cannot be identified
Multiple Choice Multiple Answer
Question
The alternate meaning of seiso is
Correct Answer
Sanities , Cleanup , Dust free / scrab
Your Answer
Sanities , Cleanup , Dust free / scrab
Multiple Choice Single Answer
Question
Production kanban is presented by :-
Correct Answer
P-kanban
Your Answer
P-kanban