Monday, May 9, 2011

Production and Operations Management -4

Production and Operations Management
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer
*Question Why graphical method of recording is preferred over the descriptive method during method study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing

Multiple Choice Multiple Answer
*Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment

Select The Blank
*Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk

Multiple Choice Multiple Answer
*Question Which of the following are examples of consumption of physical effort during recording for method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading

Multiple Choice Single Answer
*Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling

Select The Blank
*Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer Specifications

Select The Blank
*Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control

True/False
*Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True

Multiple Choice Single Answer
*Question Process Engineer does not get sufficient time for designing tooling for most economic production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less

Select The Blank
*Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance

True/False
*Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout
Correct Answer True
Your Answer True

Select The Blank
*Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level

Multiple Choice Single Answer
*Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Correct Answer Crash cost
Your Answer Crash cost

Multiple Choice Multiple Answer
*Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction

True/False
*Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer
*Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance

Select The Blank
*Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring

Multiple Choice Single Answer
*Question The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer Operation
Your Answer Production

Match The Following
*Question Correct Answer Your Answer

Toung Sweet Sweet

Eye Crack Crack

Nose Burnout Burnout

Ear Impact Impact


Select The Blank
*Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system

Multiple Choice Single Answer
*Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design

Multiple Choice Multiple Answer
*Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph

True/False
*Question All activities must not be tied up into the network
Correct Answer False
Your Answer False

Multiple Choice Multiple Answer
*Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan

Multiple Choice Multiple Answer
*Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications

Multiple Choice Multiple Answer
*Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement

Select The Blank
*Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion

True/False
*Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False

Multiple Choice Multiple Answer
*Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation

Multiple Choice Single Answer
*Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements

True/False
*Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.
Correct Answer False
Your Answer True

True/False
*Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled.
Correct Answer False
Your Answer True

Multiple Choice Single Answer
*Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory

True/False
*Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True

Multiple Choice Single Answer
*Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure

Multiple Choice Single Answer
*Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops

Multiple Choice Single Answer
*Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar

Multiple Choice Multiple Answer
*Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Select The Blank
*Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance

True/False
*Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True

Multiple Choice Single Answer
*Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow

Select The Blank
*Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%

True/False
*Question For p-chart, the central line of fraction defectives is determined by average percentage defectives.
Correct Answer True
Your Answer True

Multiple Choice Single Answer
*Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination

Multiple Choice Single Answer
*Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines

Multiple Choice Single Answer
*Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection

Match The Following
*Question Correct Answer Your Answer

Emerson Efficiency Plan Wage Payment Wage Payment

Craft Facilities Planning Facilities Planning

Work Sampling Machine utilization Sampling Inspection

Gantt Chart Production Scheduling Production Scheduling

Production and Operations Management - 11

POM assgn
Select The Blank
*Question
The ________ must ensure that the product satisfy the functional requirements of it's usage.
Correct Answer
Quality of design
Your Answer
Quality of design

Multiple Choice Multiple Answer
*Question
Which of the following information is available in summary of part in a chart during methods study?
Correct Answer
Frequency of each symbol , Total time for each symbol , Total distance travelled by the object
Your Answer
Frequency of each symbol , Total time for each symbol

True/False
*Question
The event numbers as far as possible reflect the logical relationships of the activities.
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer
*Question
Which varaible is taken along the ordinate or Y axis?
Correct Answer
Quality
Your Answer
Quality

Multiple Choice Multiple Answer
*Question
Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system?
Correct Answer
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule

Multiple Choice Single Answer
*Question
Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation?
Correct Answer
Extrernal inspection
Your Answer
Extrernal inspection

Multiple Choice Multiple Answer
*Question
Which are different ways to show critical path in a network?
Correct Answer
Thick Line , Red Line , Double Line
Your Answer
Thick Line , Red Line , Double Line

Multiple Choice Multiple Answer
*Question
What are the benefits of overhauling?
Correct Answer
It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares
Your Answer
It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares

Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Line Layout
Product Layout
Line Layout
Shop layout
Process Layout
Functional Layout
Functional Layout

Multiple Choice Multiple Answer
*Question
Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Building codes , Policies regarding issue of licences

Select The Blank
*Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level

Multiple Choice Multiple Answer
*Question
Major contributors in the development of Control Charts, Sampling plan are
Correct Answer
F H Dodge , H G Roming , Walter Schewhart
Your Answer
F H Dodge , H G Roming , Walter Schewhart

True/False
*Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
True

True/False
*Question
Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True

Select The Blank
*Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Job card

Multiple Choice Multiple Answer
*Question
Which of the following cases can be referred as operation in method study recording?
Correct Answer
Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic
Your Answer
Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic

Select The Blank
*Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Overhauling

True/False
*Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
False

Select The Blank
*Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Method

Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn

Multiple Choice Multiple Answer
*Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

True/False
*Question
In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer
*Question
Which of the following is the criteria for the percentage defectives in the zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Lots having the percentage defective less than AQL but more than LPTD

Select The Blank
*Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working

Multiple Choice Single Answer
*Question
What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Crash cost

Multiple Choice Single Answer
*Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
Semiskilled

Multiple Choice Multiple Answer
*Question
Which three of the following are causes of continuous upward pattern of Xbar-R control chart?
Correct Answer
Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer
Wear of tool , Abnormal rise in temperature , Accumulation of dirt

True/False
*Question
Root cause of most of the breakdowns is failure of the lubrication system.
Correct Answer
True
Your Answer
True

True/False
*Question
It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical activity.
Correct Answer
False
Your Answer
False

True/False
*Question
MRP software generates time periodwise requiremetn of subassemblies
Correct Answer
True
Your Answer
True

True/False
*Question
In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
*Question
What do you mean by CPM?
Correct Answer
Critical Path Method
Your Answer
Critical Path Method

Multiple Choice Multiple Answer
*Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards

Multiple Choice Multiple Answer
*Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts

Multiple Choice Single Answer
*Question
What do you mean by the verification of object against predetermined standards of quality or quantity or both?
Correct Answer
Inspection
Your Answer
Inspection

Multiple Choice Multiple Answer
*Question
What are the advantages of templates over diagrams?
Correct Answer
Can be conveniently moved on the graph paper , Less laborious , Saves time
Your Answer
Can be conveniently moved on the graph paper , Less laborious , Unskilled person can do and analyze it

True/False
*Question
It would not affect the project completion time if non-critical activities take little loner time than planned.
Correct Answer
True
Your Answer
True

Select The Blank
*Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk

Multiple Choice Single Answer
*Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory

Select The Blank
*Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Bell

Multiple Choice Single Answer
*Question
Which is the right time to prepare stores issue order?
Correct Answer
When route sheet is ready
Your Answer
When route sheet is ready

Multiple Choice Single Answer
*Question
Which element of a network represents a task which has got a definite beginning and definite end?
Correct Answer
Activity
Your Answer
Activity

Multiple Choice Single Answer
*Question
Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown?
Correct Answer
Internal inspection
Your Answer
Internal inspection

Select The Blank
*Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Dispatching

Select The Blank
*Question
The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control

Select The Blank
*Question
Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note

Multiple Choice Single Answer
*Question
Who has introduced the useful concept of control chart in 1931?
Correct Answer
Walter Shewhart
Your Answer
Walter Shewhart

Production and Operations Management - 10

POM assgn
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent

Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
Reduce material handling cost

True/False
Question
As a general rule, the number of tail event of an activity is more than that of it's head event.
Correct Answer
False
Your Answer
False

Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk

Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications

Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting

True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False

Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%

True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
What is the base for considering activity time as single time estimate or three time estimate?
Correct Answer
Level of uncertainty
Your Answer
Availability of labour

Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level

Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost

Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity

Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine.
Correct Answer
Control board
Your Answer
Move order

Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control

Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory

Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling

Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity

Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method study?
Correct Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order

Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Reduce lead time

True/False
Question
Cent percent inspection is often more practical and economical than sampling inspection.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique

Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer
Quality of design
Your Answer
Quality of design

Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn

Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.
Your Answer
Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour

True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation

Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring

Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule
Your Answer
Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
time consuming

Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working

True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True

Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity

True/False
Question
As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion.
Correct Answer
True
Your Answer
True

True/False
Question
Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer
False
Your Answer
False

Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per instruction is called
Correct Answer
Work Order
Your Answer
Work Order

Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available

Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation